Production Facility

Inside VAV Paper’s 10,000 m² Production Facility

Industrial-scale paper cutlery and sustainable food packaging production with 20 machinery systems, 7 production lines and 36 million daily production capacity.

Request Factory Information
10,000 m²Closed Production Facility
20Industrial Machines
7Production Lines
36MDaily Production Capacity
Industrial Infrastructure

Designed for scalable sustainable packaging manufacturing.

VAV Paper’s production facility is built to support high-volume paper cutlery and food packaging manufacturing for international food service, horeca, airline catering and retail packaging buyers.

  • High-capacity paper cutlery production
  • Food-safe manufacturing environment
  • OEM and private label production readiness
  • Export-focused production planning
  • FSC, BRC and Intertek-supported compliance structure
VAV Paper production facility
Production Capability

Seven production lines built for volume, consistency and export demand.

01

paper cutlery Production

Scalable manufacturing for paper spoons, forks, knives and custom cutlery formats.

02

Food Packaging Production

Production capability for sustainable paper-based food service packaging solutions.

03

OEM Manufacturing

Private label and custom manufacturing support for global packaging buyers.

Quality & Compliance

Production supported by food safety and third-party verification standards.

VAV Paper supports international buyer confidence with FSC-certified material sourcing, BRC-certified production systems and Intertek analysis reports for product verification and compliance documentation.

FSC® Certified Materials
BRC Certified Production System
Intertek Analysis Reports
Food Contact Packaging Focus

Looking for a high-capacity paper packaging manufacturer?

Contact VAV Paper to discuss OEM production, sustainable packaging supply and export-ready manufacturing solutions.

Request Quotation

Production facility: six questions for a supplier review

A production facility page introduces the manufacturing context. For a purchasing decision, connect that background to the proposed item, relevant process and evidence needed for your application. Request current confirmation of project-specific details rather than assuming that a general site description covers every configuration.

Which entity and site will make the item?

Identify the manufacturing entity and location relevant to the proposed product. Compare them with the quotation and any applicable certificates or declarations. Ask for clarification if a different site or party is involved. Keep the confirmed information in the project record so that company background and the actual manufacturing arrangement can be distinguished.

What process information is useful to the buyer?

Describe the selected product and ask which manufacturing or finishing steps affect its specification. Focus on the features relevant to your application, such as construction, coating, shape or packing. General equipment photographs provide context, but they do not confirm the exact configuration or capability proposed for an individual item.

How should a production facility review handle capacity?

State the quantities, forecast and timing required by your project. Ask the supplier to confirm availability and the proposed schedule in writing. Distinguish general site information from a commitment for the selected item. A published capacity figure should not be treated as reserved capacity, a lead-time guarantee or confirmation of a particular production slot.

Which documents should be linked to the process?

Request applicable records for the selected item, manufacturing entity and intended market. Check the scope and current version of declarations, reports and certificates. Clarify whether a document describes the company, site, raw material or finished product. Keep that distinction visible when assessing whether the evidence answers the buyer’s application question.

What should be reviewed in a sample trial?

Use a representative finished item with the intended food, serving conditions and handling process. Agree acceptance criteria before testing. Record the sample identification and specification version used. Where the final construction, artwork or packing differs, ask whether another trial is needed before approving production or treating a previous sample as the reference.

What should be confirmed before repeat production?

Retain the accepted specification, artwork, packing and evidence versions. Ask for notification of relevant changes before the next supply. Compare the repeat quotation with the approved record and resolve substitutions or discrepancies. This makes the site review useful for ongoing purchasing while avoiding assumptions that every production run is automatically identical.

production facility review: Nova tray product reference
Product reference; confirm the proposed item and intended use.

For background, consult the European Commission food-contact legislation overview. Request current evidence for the selected item. Send your project questions.